Secondary Auxiliary Fans
COMPACT AND MIGHTY FOR MAXIMUM PRESSURE WITH MINIMUM FUSS
Keep additional fan installations and mid-project shutdowns to a minimum, with Minetek's Secondary Auxiliary fans.
Minetek's Secondary Axial fans are compact in size; 40% shorter and 10% lighter than standard fans with a low-profile ducting, which makes installation easy. The high pressure capability of Minetek's High Output (HO) axial fan is more than double of standard fans of comparable size. This results in less fans needed overall.
Benefit from a plethora of additional features, from Australian engineering, automation, syncronisation between fans and full control from the surface.
Minetek's secondary fans / auxiliary fans are available as both impulse bladed and vane axial versions.
LONG DUCT RUNS
The concentrated power of Minetek's High Output (HO) Axial Fans, makes them the ideal solution for long duct runs.
The ability to install a single auxillary fan that can ramp up to the increasing duty point needed as the project expands saves both time and money.
Complimented by the need for only a single duct run, PLC screen surface control, and the added bonus of being able to surge the fan past the required duty point to clear gases and dust for fast re-entry make Minetek the ideal choice.
Technical Enquiry
x
Sales Enquiry
x
Our Capabilities
Primary Ventilation Fans
Secondary Auxiliary Fans
Booster Fans
Multiple Heading Ventilation
Bulkhead Fans
Long Duct Runs
Tunnel Fans
Development Fans
Mine Air Control (Mac)
I can honestly say I have found MINTEK WATER a very professional organisation in all the dealings that I have had with them. They have always been proactive and looked for and suggested alternatives to assist me in the delivery of my projects whilst still working on the original concept.
MINETEK initially provided products for heavy mobile equipment noise abatement at the New Acland Mine. These installations have been very successful and prompted the contracting of MINETEK to conduct a full mobile fleet and fixed plant noise monitoring assessment at the Acland mine site.
MINETEK have been instrumental in the design of products used on our mining equipment. Our engagement with them is a true business partnership.
MINETEK's installations have been very successful and prompted the contracting of MINETEK to conduct a full mobile fleet and fixed plant noise monitoring assessment at the Acland mine site.
We have placed some difficult demands upon MINETEK. These demands are never an issue, and are met with the enthusiasm and professionalism we have grown to expect from the MINETEK team.