electrical control system (mcc)
Minetek Water Evaporation Systems can be supplied as a turnkey package, delivered to site ready for installation.
For a turnkey system project, Minetek would supply the following scope:
- QTY x Minetek Evaporators
- Electrical Control Board MCC
- Pumping System
- Poly Pipe Package
- Electrical and Control Cable Package
- Design and Engineering Package
- Freight and Logistics to Site
- Automation Control Package (EMS) and Weather Station
- Commissioning and Training
Technical Enquiry
x
Sales Enquiry
x
We found the MINETEK WATER team listened and supported our situation with helpful guidance and advice to layout the evaporator pipework maximising their efficiency. I would highly recommend the units to others needing a cost effective solution to excess water.”
It was completed with no incidents or injuries, with no delays, and ahead of schedule. The plan was for 10 shifts, and it was completed in 7 shifts.
The relatively small fans allowed us to utilise our existing bulkhead, where we were severely limited by space, which allowed us to use our existing infrastructure and dramatically reduce downtime in the mine during the change out. The installation was completed safely... and allows us to scale our ventilation flow with their pressure on demand system to suit our production profile.
Kipoi have successfully utilized MINETEK WATER evaporators on our process water pond to remove mine water and has contributed to help with our water balance. We are currently in the process of moving these units to where the catchment area is larger giving us better utilization of the evaporators.
Our evaporators are still performing flawlessly and working absolutely great. They have been running 24/7 without a single hiccup. Thanks again!