Skip to content
Search
Close this search box.

electrical control system (mcc)

Minetek Water Evaporation Systems can be supplied as a turnkey package, delivered to site ready for installation.

For a turnkey system project, Minetek would supply the following scope:

  • QTY x Minetek Evaporators
  • Electrical Control Board MCC
  • Pumping System
  • Poly Pipe Package
  • Electrical and Control Cable Package
  • Design and Engineering Package
  • Freight and Logistics to Site
  • Automation Control Package (EMS) and Weather Station
  • Commissioning and Training

Technical Enquiry

x

Sales Enquiry

x

Our evaporators are still performing flawlessly and working absolutely great. They have been running 24/7 without a single hiccup. Thanks again!

Klondex Mines Process Maintenance Planning Manager

After investigating a raft of different methods from sprinkler systems through to desalination systems (too costly for little benefit) we decided on the MINETEK WATER units. The evaporators were easy to install and once activated ran trouble free. We were very happy with the service from MINETEK and the reliability of the system.

OCE Glencore Collinsville Superintendent

Our evaporators are still performing flawlessly and working absolutely great. They have been running 24/7 without a single hiccup. Thanks again!”

Klondex Mines Process Maintenance Planning Manager

We have placed some difficult demands upon MINETEK. These demands are never an issue, and are met with the enthusiasm and professionalism we have grown to expect from the MINETEK team.

Liebherr Australia Mining Manager

MINETEK initially provided products for heavy mobile equipment noise abatement at the New Acland Mine. These installations have been very successful and prompted the contracting of MINETEK to conduct a full mobile fleet and fixed plant noise monitoring assessment at the Acland mine site.

New Hope Group Project Superintendent
Industries
Resource Centre​

Solutions

Download